Deadline for Voyage Data Recorders upgrade 1 July 2022 is approaching fast

The update to the EPIRB performance standard has had a knock-on effect on the IMO’s VDR and S-VDR performance standards, as the VDR’s float-free data capsule is required to meet the requirements of the latest EPIRB performance standard.

VDRs installed on or after 1 July 2022*, are to be approved to IMO Resolution MSC.333(90), as amended by MSC.494(104). Similarly, S-VDRs installed on or after 1 July 2022*, are to be approved to IMO Resolution MSC.163(78), as amended by Resolution MSC.214(81) and MSC.493(104.

 

 

 

The voyage data recorder (VDR) system, including all sensors, shall be subjected to an annual performance test. The test shall be conducted by an approved testing or servicing facility to verify the accuracy, duration, and recoverability of the recorded data. In addition, tests and inspections shall be conducted to determine the serviceability of all protective enclosures and devices fitted to aid location. A copy of the certificate of compliance issued by the testing facility, stating the date of compliance and the applicable performance standards, shall be retained on board the ship. Albion Marine Solutions can assist you with these services and upgrades. Please contact This email address is being protected from spambots. You need JavaScript enabled to view it.



Albion Marine Solutions Ltd.

Suite 304 - 800 Carleton Court 

Delta, BC V3M 6Y6

Canada

Email : info@albionmarine.com

Tel     : +1 604 529 8488

Home

Our Services

Contact Us

News 

Careers