Espada Desgagnes: Turnkey project Installation of Alfa Laval BWTS

Albion Marine Solutions Turnkey package: Ship owners and BWTS manufacturers benefit from our unique turnkey BWTS retrofit package which in its entirety includes the following but can be customized to integrate only the required elements.

  •           Superior Project Management capabilities
  •           Worldwide network and ability to manage multiple international vendors
  •           Capable Site Supervision team
  •           Experienced GRE Piping team
  •           Experienced Electrical team including modifications to main switch board
  • Prefabrication for steel piping and structures
  •          Superior error-free design
  •          Procurement system        Supply of electrical panels and switchboards
  •          Supply of valves

 

  • Supply of various components: cables, alarm system, automation
  •  Class approval management
  •  Sampling
  •  Crew training
  •  Troubleshooting and after sales support in operation

 

Primary supplier of all the pieces of equipment required for BWTS Retrofit, which includes supplying of spare parts, GRE pipes, Flanges, Pipe Spools, tubes, Valves with hydraulic actuators, liquid flow valves & liquid flow controllers, Electrical Panels, Electric cables, Thermo cables, Elbow bell, Grounding Saddles, and Albion marine assembled distribution boards etc.